Thursday, February 21, 2013

Zephyr on her mooring

She could do with a pump-out but should be OK with her new mooring equipment.

Posted by Picasa

Wednesday, February 20, 2013

Zephyr's new 'Ground Tackle'

This view shows the outer stake position before being driven home under the water/sand, the masonry block is roughly where the inner stake is located.

Detail of inner stake before being driven home and before the masonry block was buried. The wire has also been taken away. The masonry block is looped round the chain. The original block looks OK and was therefore re-used.

This view shows the chain running from the inner stake towards the outer stake, and the general location of the block - a little further out than before..

Posted by Picasa